what we did

Services provided

To support the successful delivery of this project, our team provided a range of services which included:

  • Plant, labour and materials for the installation of over 700 precast concrete ‘Legato’ blocks to create waste segregation bays
  • Reinforced concrete retaining walls
  • Drainage remediation
  • Setting out (line and level control) and as-built surveys
Biffa Case Study Images
Biffa Case Study Images
Biffa Case Study Images
Biffa Case Study Images
  the specifics

more details

Delivered nationwide across a series of Biffa Waste Management projects, our team provided a range of specialist civil engineering and construction services.

Works included the installation of over 700 precast concrete ‘Legato’ blocks to form robust waste segregation bays, reinforced concrete retaining walls, drainage remediation, and high-quality painting and finishing works. Setting out (line and level control) and as-built surveys were integral to every package, ensuring precision, quality assurance, and consistent delivery across all project sites.